Trenchless Pipeline Rehabilitation Technology-Ultraviolet Curing Method/UV-CIPP
I. Introduction
1.1 Technology Overview
UV Cured-in-Place Pipe (UV-CIPP) is a trenchless pipeline rehabilitation technology that has revolutionized the underground drainage pipe repair industry over the past two decades. This innovative method allows for the in-situ rehabilitation of pipes using glass fiber liners and ultraviolet light curing systems instead of excavation and replacement of underground pipes for wastewater and other applications (18). The technology has gained significant traction globally due to its numerous advantages over traditional methods, including reduced environmental impact, faster installation times, and improved structural integrity.
The UV-CIPP process involves inserting a resin-impregnated glass fiber liner into the existing pipeline. Once in place, ultraviolet light is used to cure the resin, creating a new, structurally sound pipe within the original one (18). This method eliminates the need for extensive excavation, reducing disruption to traffic, businesses, and communities while minimizing environmental impact.
1.2 Advantages of UV-CIPP Technology
UV-CIPP technology offers several key advantages over traditional pipe repair and replacement methods:
Superior Mechanical Properties: UV-CIPP technology provides higher mechanical properties compared to felt liners, such as thinner liner wall thicknesses, which results in cost-effective solutions and other benefits like hydraulic improvements to the end user (18). The cured liner exhibits exceptional strength and durability, making it suitable for a wide range of applications.
Environmental Benefits: When utilizing UV CIPP, a UV liner such as the Enviro Cure® V is pre-impregnated with resin before it reaches the project site, which helps alleviate any styrene off-gassing concerns (50). Not only is the resin completely encapsulated within the liner, but the liner's multilayer combination of felt and fiberglass provides a corrosion-resistant barrier with high physical strength resulting in a thinner pipe wall design than traditional CIPP (50).
Cost-Effectiveness: UV pipe lining can be more cost-effective than traditional methods, such as open-cut pipe replacement. The reduced labor and material costs associated with excavation and replacement contribute to cost savings (102). Additionally, the cured-in-place pipe process has become one of the most widely used rehabilitation methods in the world, with proven effectiveness in addressing structural and non-structural issues (65).
Time Efficiency: Light curing technology is a game-changer for CIPP lining contractors. Not only does it cut installation times dramatically (from several hours to just minutes), a virtually unlimited pot life and the ability to wet-out liners offsite ensures that technicians are not racing against time constraints (51).
Enhanced Durability: Compared to traditional curing methods, the UV CIPP lining process is capable of creating pipes that are stronger and more durable (107). The cured liner forms a seamless, jointless structure that effectively prevents infiltration and exfiltration, extending the service life of the pipeline.
1.3 Applications and Scope
UV-CIPP technology is suitable for a wide range of applications in the underground drainage sector:
- Municipal Sewer Systems: Rehabilitation of aging or damaged sewer pipelines without excavation
- Stormwater Drainage: Repair and maintenance of storm drains and culverts
- Industrial Wastewater Systems: Corrosion-resistant lining for pipelines carrying industrial effluents
- Water Transmission Pipelines: Rehabilitation of potable water pipelines
- Specialized Applications: Including pipelines under roads, railways, rivers, and other sensitive areas
This technical guide focuses on the application of UV-CIPP technology for the rehabilitation of underground drainage pipes, providing detailed information on materials, design principles, installation procedures, quality control, and case studies.
II. Materials and Components
2.1 Resin Systems for UV-CIPP
The resin system is a critical component of the UV-CIPP technology, as it provides the necessary structural integrity and chemical resistance to the cured liner. Three main types of resins are used in UV-CIPP applications:
Epoxy Resins: Offer excellent mechanical properties, chemical resistance, and adhesion. Epoxy-based UV-CIPP systems are known for their high strength and durability, making them suitable for structural applications. They exhibit good resistance to a wide range of chemicals, including acids, alkalis, and solvents.
Vinyl Ester Resins: Provide a balance between mechanical properties and chemical resistance. Vinyl ester resins are particularly suitable for applications where resistance to aggressive chemicals is required, such as industrial wastewater pipelines. They offer good flexibility and impact resistance.
Polyester Resins: Are cost-effective and offer good general performance. Polyester resins are commonly used in non-critical applications where moderate chemical resistance and mechanical properties are sufficient. They cure quickly under UV light, making them suitable for time-sensitive projects.
All three resin types can be formulated with photoinitiators that respond to UV light, allowing for rapid curing. The choice of resin depends on factors such as the application environment, required mechanical properties, chemical resistance needs, and project budget.
2.2 Reinforcement Materials
The reinforcement materials used in UV-CIPP systems provide the structural strength and dimensional stability to the cured liner. The two primary types of reinforcement materials are:
Glass Fiber Fabrics: Provide high tensile strength and stiffness. Glass fiber-reinforced UV-CIPP systems offer superior mechanical properties compared to felt liners, allowing for thinner liner wall thicknesses while maintaining structural integrity (18). The use of glass fiber fabrics results in a stronger and more durable liner with improved hydraulic characteristics.
Non-Woven Fabrics: Typically made from polyester fibers, non-woven fabrics offer good flexibility and conformability. They are often used in combination with glass fiber fabrics to create composite liners that balance strength, flexibility, and cost.
The reinforcement materials are typically pre-impregnated with resin before being inserted into the pipeline. This pre-impregnation process ensures uniform resin distribution and eliminates the need for on-site resin mixing, reducing installation time and potential for errors.
2.3 Liner Construction
UV-CIPP liners are constructed using a multi-layer design that combines the benefits of different materials:
Inner Layer: Typically a smooth film that provides a low-friction surface for the curing process and ensures a smooth internal surface on the cured liner.
Reinforcement Layer: Composed of glass fiber fabric, non-woven fabric, or a combination of both, providing structural strength and dimensional stability.
Outer Layer: A protective film that prevents UV light from curing the resin before the liner is in place and provides protection during installation.
This multi-layer construction provides the cured liner with excellent mechanical properties, chemical resistance, and durability. The specific construction varies depending on the manufacturer and the intended application.
2.4 Ancillary Materials and Components
Several ancillary materials and components are essential for the successful installation of UV-CIPP systems:
Photoinitiators: Chemical compounds that initiate the polymerization reaction when exposed to UV light. The choice of photoinitiator depends on the resin type and the UV light source used.
Adhesion Promoters: Improve the bond between the resin and the reinforcement materials, enhancing the overall performance of the liner.
UV Stabilizers: Protect the cured liner from degradation due to UV exposure after installation.
Inflation Media: Typically air or water, used to expand the liner against the host pipe during the curing process.
Curing Units: UV light sources used to initiate and control the curing process. Modern UV-CIPP systems often use LED technology, which offers advantages over traditional mercury lamps in terms of energy efficiency, longevity, and environmental impact.
III. Design Principles
3.1 Structural Design Considerations
The design of a UV-CIPP liner must consider several structural factors to ensure the rehabilitation meets the required performance criteria:
Liner Thickness: The required thickness of the UV-CIPP liner depends on factors such as the diameter of the host pipe, the expected service loads, the condition of the host pipe, and the desired service life. Thinner liners can be used with UV-CIPP compared to traditional CIPP methods due to the superior mechanical properties of glass fiber-reinforced systems (18).
Strength Requirements: The liner must be designed to withstand the expected internal and external loads. For structural applications, the liner should be capable of supporting the full design loads. For semi-structural applications, the liner shares the load with the host pipe.
Deflection Limits: The design should consider the allowable deflection of the liner under load. Excessive deflection can lead to structural failure or reduced hydraulic capacity.
Joint Design: Special consideration must be given to the design of connections between the liner and existing pipeline appurtenances, such as manholes and lateral connections.
3.2 Hydraulic Design Considerations
Hydraulic performance is a critical aspect of any drainage pipeline rehabilitation project:
Flow Capacity: The rehabilitated pipeline must maintain adequate flow capacity. The reduction in diameter due to the liner must be considered in the design.
Surface Roughness: The internal surface roughness of the cured liner affects flow resistance. UV-CIPP liners typically have a smooth internal surface, reducing friction losses and maintaining good hydraulic performance.
Cross-Sectional Shape: The shape of the host pipe and the cured liner affects flow characteristics. Circular cross-sections are most common, but other shapes may be necessary for specific applications.
Slope Requirements: The design must ensure that the rehabilitated pipeline maintains the required slope for proper drainage.
3.3 Design Methods and Standards
Several design methods and standards are available for UV-CIPP systems:
Empirical Methods: Based on past experience and performance data, these methods provide general guidelines for liner thickness and material selection.
Analytical Methods: Use mathematical models to predict the structural performance of the liner under various loading conditions. These methods require detailed input parameters and engineering expertise.
Numerical Methods: Finite element analysis and other numerical techniques can provide detailed predictions of liner behavior under complex loading conditions.
Standards and Specifications: Several standards and specifications provide guidance for the design of UV-CIPP systems, including ASTM F2019, ASTM D6908, and CEN/TS 16100.
The design process typically involves the following steps:
- Assessment of the existing pipeline condition
- Determination of the required performance criteria
- Selection of appropriate materials and system components
- Calculation of required liner thickness and other design parameters
- Development of detailed design drawings and specifications
- Review and approval of the design by qualified engineers
3.4 Special Design Considerations
Certain conditions may require special design considerations for UV-CIPP applications:
Curved Pipelines: Liner design must account for the additional stresses and installation challenges associated with curved sections. Specialized installation techniques may be required.
High-Pressure Applications: For pipelines subject to higher internal pressures, such as force mains, the liner design must account for the additional stresses.
Corrosive Environments: When rehabilitating pipelines carrying aggressive fluids, the resin system must be selected for its chemical resistance properties.
Freeze-Thaw Cycles: In areas subject to freezing temperatures, the liner design must account for the additional stresses caused by freeze-thaw cycles.
Seismic Zones: In seismic zones, the liner must be designed to withstand ground movement and potential soil liquefaction.
IV. Installation Process
4.1 Pre-Installation Inspection and Preparation
Before beginning the UV-CIPP installation process, thorough inspection and preparation of the pipeline are essential:
Pipeline Inspection: A comprehensive inspection of the host pipeline should be conducted using techniques such as CCTV inspection, sonar testing, or laser profiling. This inspection identifies the condition of the pipeline, any existing defects, and potential obstacles that could affect the installation process.
Cleaning and Debris Removal: The pipeline must be thoroughly cleaned to remove debris, scale, corrosion products, and other obstructions. High-pressure water jetting is commonly used for this purpose.
Defect Repair: Any significant defects in the host pipe that could interfere with the installation process or compromise the performance of the liner should be repaired prior to installation. This may include filling voids, removing protrusions, or repairing cracks.
Connection Sealing: All lateral connections and service taps must be properly sealed to prevent leakage during the installation process and ensure a proper bond between the liner and the host pipe.
Ventilation: The pipeline should be properly ventilated to remove any potentially hazardous gases and ensure safe working conditions.
4.2 Liner Preparation and Insertion
Once the pipeline is prepared, the UV-CIPP liner can be prepared and inserted:
Liner Selection: The appropriate liner size and type are selected based on the design requirements and the characteristics of the host pipeline.
Resin Impregnation: The reinforcement materials are impregnated with the selected resin system. In modern UV-CIPP systems, the liner is typically pre-impregnated at the factory, eliminating the need for on-site resin mixing (50).
Liner Insertion: The impregnated liner is inserted into the host pipeline using methods such as inversion, pulling, or pushing. Specialized equipment may be used to facilitate this process, ensuring the liner is properly positioned without damage.
Liner Inflation: Once in place, the liner is inflated using air or water pressure to press it against the host pipe. This inflation must be carefully controlled to ensure uniform contact between the liner and the host pipe.
4.3 Curing Process
The curing process is a critical step in the UV-CIPP installation:
UV Light Application: High-intensity UV light is applied to the inflated liner, initiating the polymerization reaction in the resin. Modern systems often use LED technology, which offers advantages over traditional mercury lamps (101).
Curing Parameters: The curing process must be carefully controlled to ensure the resin cures properly. Key parameters include the intensity of the UV light, the exposure time, and the temperature of the liner.
Curing Monitoring: The curing process should be monitored to ensure uniformity and completeness. This may involve measuring the temperature of the liner, monitoring the UV light output, or using other specialized techniques.
Cooling Phase: After curing, the liner is allowed to cool before the inflation pressure is released. This cooling phase helps ensure the liner maintains its shape and structural integrity.
4.4 Post-Installation Processing
After the curing process is complete, several post-installation steps are necessary:
Pressure Release: The inflation pressure is gradually released, allowing the cured liner to settle into place.
Liner Trimming: Excess material at the ends of the liner is trimmed to provide a smooth transition with the existing pipeline.
Connection Restoration: Lateral connections and service taps are reopened and properly sealed to ensure the integrity of the system.
Final Inspection: A final inspection of the installed liner is conducted to check for defects, ensure proper bonding, and verify the overall quality of the installation.
Performance Testing: The rehabilitated pipeline may undergo performance testing, such as hydrostatic testing or smoke testing, to verify its integrity and functionality.
4.5 Specialized Installation Techniques
Several specialized techniques may be used for UV-CIPP installations in challenging conditions:
Steep Slopes: Specialized equipment and techniques are required for installations in pipelines with steep slopes to prevent the liner from slipping during the installation process.
Long Spans: For long pipeline segments, specialized insertion and curing techniques may be necessary to ensure the liner is properly positioned and cured throughout its entire length.
Tight Curves: Installations in pipelines with tight curves require specialized equipment and techniques to navigate the bends without damaging the liner.
Deep Burials: For pipelines buried at significant depths, the design and installation must account for the additional external pressures.
Underwater Installations: Specialized techniques may be required for rehabilitating pipelines located underwater or in high groundwater conditions.
V. Quality Control and Assurance
5.1 Material Quality Control
Ensuring the quality of materials used in UV-CIPP applications is essential for the success of the rehabilitation project:
Resin Testing: Resins should be tested for properties such as viscosity, gel time, pot life, and mechanical properties. These tests ensure the resin meets the specified requirements and performs as expected during installation and service.
Reinforcement Material Testing: The reinforcement materials should be tested for properties such as tensile strength, elongation, and dimensional stability. These tests ensure the reinforcement materials provide the necessary structural performance.
Liner Quality Checks: Pre-impregnated liners should be inspected for defects such as voids, resin-rich areas, or resin-starved areas. The dimensions of the liner should also be checked to ensure it meets the specified requirements.
Batch Testing: Each batch of materials should be tested to ensure consistency and compliance with the specifications.
5.2 Installation Process Control
Strict control of the installation process is necessary to ensure the UV-CIPP system performs as designed:
Installation Records: Detailed records of the installation process should be maintained, including parameters such as insertion speed, inflation pressure, curing time, and UV light intensity. These records provide a valuable reference for quality assurance and future maintenance.
Temperature Monitoring: The temperature of the liner during installation and curing should be monitored to ensure it remains within the specified limits. Excessive temperatures can damage the resin, while insufficient temperatures may result in incomplete curing.
Pressure Control: The inflation pressure must be carefully controlled to ensure the liner makes uniform contact with the host pipe without causing damage.
UV Exposure Control: The intensity and duration of UV exposure must be carefully controlled to ensure the resin cures properly throughout the entire thickness of the liner.
5.3 Post-Installation Inspection and Testing
After installation, thorough inspection and testing are necessary to verify the quality and performance of the UV-CIPP system:
Visual Inspection: A visual inspection of the cured liner should be conducted to check for defects such as cracks, voids, or incomplete curing.
CCTV Inspection: A CCTV inspection provides a detailed visual assessment of the interior of the liner, allowing for the detection of defects that may not be visible during a surface inspection.
Structural Integrity Testing: Various methods can be used to assess the structural integrity of the liner, including impact testing, deflection testing, and pressure testing.
Leak Testing: The rehabilitated pipeline should be tested for leaks using methods such as hydrostatic testing, air testing, or smoke testing.
Flow Testing: Flow testing can be conducted to verify the hydraulic performance of the rehabilitated pipeline.
5.4 Compliance with Standards and Specifications
UV-CIPP installations should comply with relevant standards and specifications to ensure quality and performance:
ASTM Standards: ASTM F2019 provides guidelines for the installation of resin-impregnated glass fiber hose for pipeline rehabilitation. ASTM D6908 covers the integrity testing of water filtration membrane systems, which may be relevant for certain applications.
CEN Standards: CEN/TS 16100 provides technical specifications for the design, installation, and testing of CIPP systems for pipeline rehabilitation.
Industry-Specific Standards: Various industry organizations have developed standards and guidelines for UV-CIPP applications in specific sectors, such as wastewater treatment, stormwater management, and potable water distribution.
Project-Specific Specifications: Each project may have specific requirements based on the characteristics of the host pipeline, the environmental conditions, and the performance expectations.
VI. Case Studies
6.1 European Case Study: Urban Sewer Rehabilitation in Germany
A major city in Germany faced significant challenges with its aging sewer system, particularly in a densely populated urban area. The city's engineers selected UV-CIPP technology for a critical rehabilitation project due to its minimal disruption and high-quality results.
Project Scope: The project involved rehabilitating 1,500 meters of 600-800 mm diameter concrete sewer pipes located under a busy commercial district. The pipes exhibited various defects including cracks, corrosion, and joint failures.
Material Selection: A glass fiber-reinforced UV-CIPP system with an epoxy resin was selected for its high strength, chemical resistance, and ability to form a seamless liner.
Installation Process: The installation was carried out using a combination of pulling and inversion methods. The liners were pre-impregnated with resin at the factory and inserted into the host pipes. LED-based UV curing units were used to cure the resin, significantly reducing the curing time compared to traditional methods.
Challenges Overcome: The project faced several challenges, including working in a congested urban environment, coordinating with multiple stakeholders, and ensuring minimal disruption to businesses and traffic. Specialized equipment was used to navigate tight access points and ensure proper installation in challenging locations.
Results: The UV-CIPP rehabilitation was completed successfully, with minimal disruption to the surrounding area. The cured liners provided excellent structural integrity and hydraulic performance, extending the service life of the sewer system by at least 50 years. The project was completed on time and within budget, demonstrating the efficiency and cost-effectiveness of UV-CIPP technology.
6.2 North American Case Study: Stormwater Pipe Rehabilitation in Canada
A municipality in Ontario, Canada, faced a critical need to rehabilitate a stormwater sewer system that was experiencing significant leakage and structural deterioration. The project was particularly challenging due to the sensitive environmental setting and the need to maintain service during construction.
Project Scope: The project involved rehabilitating 800 meters of 900-1200 mm diameter concrete stormwater pipes located in a environmentally sensitive area with direct outlets to local creeks.
Material Selection: A UV-CIPP system with a vinyl ester resin was selected for its excellent chemical resistance and ability to withstand the harsh conditions of stormwater service.
Installation Process: The installation was carried out using a combination of pulling and inversion methods. The liners were pre-impregnated with resin at the factory and inserted into the host pipes. LED-based UV curing units were used to cure the resin, significantly reducing the curing time compared to traditional methods.
Challenges Overcome: The project faced several challenges, including working in a environmentally sensitive area, maintaining service during construction, and ensuring compliance with strict environmental regulations. Specialized techniques were used to prevent any potential contamination of the local waterways during the installation process.
Results: The UV-CIPP rehabilitation was completed successfully, with minimal environmental impact. The cured liners provided excellent structural integrity and hydraulic performance, extending the service life of the stormwater system by at least 50 years. The project was completed on time and within budget, demonstrating the efficiency and environmental benefits of UV-CIPP technology (101).
6.3 Australian Case Study: Large Diameter Sewer Rehabilitation
A major city in Australia faced significant challenges with a deteriorating large-diameter sewer trunk line that was nearing the end of its service life. The pipe was located under a major highway, making traditional excavation-based repair methods impractical.
Project Scope: The project involved rehabilitating 500 meters of 1800 mm diameter reinforced concrete sewer pipe located under a major highway. The pipe exhibited significant structural deterioration, including cracks, corrosion, and joint failures.
Material Selection: A glass fiber-reinforced UV-CIPP system with an epoxy resin was selected for its high strength and ability to form a seamless liner capable of withstanding the high external loads.
Installation Process: The installation was carried out using a combination of pulling and inversion methods. The liners were pre-impregnated with resin at the factory and inserted into the host pipes. LED-based UV curing units were used to cure the resin, significantly reducing the curing time compared to traditional methods.
Challenges Overcome: The project faced several challenges, including working under a major highway, coordinating with multiple stakeholders, and ensuring minimal disruption to traffic. Specialized equipment was used to navigate the tight access points and ensure proper installation in the challenging location.
Results: The UV-CIPP rehabilitation was completed successfully, with minimal disruption to traffic and surrounding areas. The cured liners provided excellent structural integrity and hydraulic performance, extending the service life of the sewer system by at least 50 years. The project was completed on time and within budget, demonstrating the efficiency and effectiveness of UV-CIPP technology for large-diameter pipe rehabilitation.
6.4 Comparative Analysis of Case Studies
A comparison of the three case studies provides valuable insights into the versatility and effectiveness of UV-CIPP technology across different applications and environments:
Table 1: Comparative Analysis of UV-CIPP Case Studies
Parameter | German Sewer Rehabilitation | Canadian Stormwater Project | Australian Trunk Sewer |
Pipe Diameter | 600-800 mm | 900-1200 mm | 1800 mm |
Pipe Material | Concrete | Concrete | Reinforced Concrete |
Length | 1,500 meters | 800 meters | 500 meters |
Environment | Urban commercial | Environmentally sensitive | Under major highway |
Resin Type | Epoxy | Vinyl Ester | Epoxy |
Curing Method | LED UV | LED UV | LED UV |
Challenges | Urban congestion | Environmental sensitivity | High traffic area |
Result | Successful rehabilitation with 50+ year service life | Successful rehabilitation with minimal environmental impact | Successful rehabilitation under challenging conditions |
This comparative analysis demonstrates that UV-CIPP technology can be successfully applied in diverse environments and for various pipe sizes and materials. The use of LED UV curing technology was common across all cases, highlighting its growing adoption in the industry.
VII. Comparison with Other Rehabilitation Technologies
7.1 UV-CIPP vs. Traditional CIPP
UV-CIPP represents a significant advancement over traditional CIPP (Cured-in-Place Pipe) technology, which typically uses hot water or steam for curing:
Curing Method: The primary difference between UV-CIPP and traditional CIPP is the curing method. Traditional CIPP uses hot water or steam, while UV-CIPP uses ultraviolet light. This fundamental difference leads to several operational and performance advantages for UV-CIPP (101).
Curing Time: UV-CIPP cures much faster than traditional CIPP, reducing installation time from several hours to just minutes (51). This significantly increases productivity and reduces project timelines.
Energy Consumption: UV-CIPP systems consume less energy than traditional CIPP methods, contributing to lower operating costs and a smaller environmental footprint.
Installation Records: The quality control and testing standards are different for UV-CIPP compared to traditional felt and resin systems. Being a computer-controlled curing process, the requested installation records are different than water or steam cure (101).
Material Compatibility: The resins used in UV-CIPP are similar to those used in traditional CIPP, but a different initiator package is used for UV cure (25). This allows for rapid curing under UV light while maintaining the desirable properties of the resin system.
Emissions: UV-CIPP systems typically produce fewer volatile organic compound (VOC) emissions compared to traditional CIPP methods, providing environmental and safety benefits (25).
7.2 UV-CIPP vs. Spiral Wound Lining
Spiral wound lining is another trenchless rehabilitation technology that involves inserting a flexible strip into the host pipe and spirally winding it to form a new pipe. When compared to UV-CIPP:
Material Composition: Spiral wound linings are typically made from PVC or HDPE strips, while UV-CIPP liners are made from resin-impregnated glass fiber or felt materials.
Installation Process: Spiral wound lining involves continuously feeding a flexible strip into the pipeline and winding it into place, while UV-CIPP involves inserting a pre-impregnated liner and curing it in place.
Structural Performance: Both technologies can provide structural reinforcement, but UV-CIPP typically offers higher strength-to-weight ratios due to the use of glass fiber reinforcement.
Hydraulic Performance: UV-CIPP liners typically have a smoother internal surface than spiral wound linings, resulting in better hydraulic performance and less resistance to flow.
Application Range: Spiral wound lining is often preferred for larger diameter pipes and longer lengths, while UV-CIPP is suitable for a wider range of diameters and can be more easily applied in complex geometries.
Cost Comparison: The cost of spiral wound lining and UV-CIPP can vary depending on factors such as pipe diameter, length, and site conditions. In general, UV-CIPP may offer cost advantages for smaller diameter pipes and shorter lengths, while spiral wound lining may be more economical for larger diameters and longer runs.
7.3 UV-CIPP vs. Slip Lining
Slip lining involves inserting a smaller diameter pipe inside the host pipe, creating an annular space that may be grouted. When compared to UV-CIPP:
Installation Process: Slip lining involves physically inserting a new pipe into the host pipe, while UV-CIPP involves inserting a flexible liner that conforms to the shape of the host pipe.
Space Requirements: Slip lining reduces the internal diameter of the pipeline more significantly than UV-CIPP, potentially reducing flow capacity.
Structural Performance: UV-CIPP provides a structural liner that adheres to the host pipe, while slip lining typically provides a semi-structural or non-structural solution unless grouted.
Connection Details: Slip lining requires special connections at each end and for lateral taps, while UV-CIPP forms a seamless liner that can be more easily connected to existing appurtenances.
Application Range: Slip lining is often used for larger diameter pipes and when the host pipe is in relatively good condition. UV-CIPP can be used in a wider range of conditions, including pipes with significant defects.
Cost Comparison: The cost of slip lining and UV-CIPP varies depending on factors such as pipe diameter, length, and site conditions. UV-CIPP may offer cost advantages in situations where maintaining flow capacity is important or when the host pipe has significant defects.
7.4 UV-CIPP vs. Spray-In-Place Lining
Spray-in-place lining (SIPL) involves spraying a resin directly onto the interior of the host pipe. When compared to UV-CIPP:
Material Application: Spray-in-place lining involves spraying the resin directly onto the pipe wall, while UV-CIPP involves inserting a pre-impregnated liner.
Reinforcement: UV-CIPP typically includes a reinforcement layer (such as glass fiber), while spray-in-place lining may or may not include reinforcement, depending on the application.
Thickness Control: UV-CIPP provides more precise control over the thickness of the lining compared to spray-in-place methods, which can vary depending on the application technique.
Surface Preparation: Both technologies require thorough cleaning and preparation of the host pipe interior, but spray-in-place lining may require more detailed surface preparation to ensure proper adhesion.
Application Range: Spray-in-place lining is often used for smaller diameter pipes and for spot repairs, while UV-CIPP is suitable for longer lengths and larger diameters.
Cost Comparison: The cost of spray-in-place lining and UV-CIPP varies depending on factors such as pipe diameter, length, and site conditions. UV-CIPP may offer cost advantages for longer lengths and larger diameters, while spray-in-place lining may be more economical for smaller areas and spot repairs.
7.5 Technology Selection Guide
Selecting the most appropriate rehabilitation technology depends on several factors. The following table provides a guide for selecting between UV-CIPP and other common trenchless rehabilitation technologies:
Table 2: Technology Selection Guide
Factor | UV-CIPP | Traditional CIPP | Spiral Wound Lining | Slip Lining | Spray-in-Place Lining |
Pipe Diameter | Suitable for 150-2000 mm | Suitable for 150-2700 mm | Best for 300-3000 mm | Suitable for all diameters | Best for 150-1500 mm |
Curing Time | Rapid (minutes) | Slow (hours) | Immediate | Immediate | Varies |
Strength | High | Medium | Medium | Medium | Low to medium |
Hydraulic Performance | Excellent | Good | Fair | Fair | Good |
Chemical Resistance | Excellent | Good | Good | Good | Good |
Site Disruption | Low | Medium | Medium | High | Low |
Cost | Medium to high | High | Medium | Medium | Low to medium |
Specialized Equipment | Required | Required | Required | Required | Required |
Typical Applications | Structural and semi-structural rehabilitation of gravity sewers and pressure pipes | General rehabilitation of various pipe types | Large diameter pipes and long runs | Pipes requiring minimal diameter reduction | Small diameter pipes and spot repairs |
This technology selection guide helps identify the most appropriate rehabilitation method based on specific project requirements. UV-CIPP stands out for its combination of high strength, excellent hydraulic performance, and low site disruption, making it suitable for many challenging applications.
VIII. Emerging Trends and Future Developments
8.1 Advancements in UV-CIPP Materials
The materials used in UV-CIPP systems continue to evolve, driven by the need for improved performance, durability, and sustainability:
High-Performance Resins: Development of new resin formulations with enhanced mechanical properties, chemical resistance, and UV stability. These advanced resins offer improved performance in challenging environments while maintaining rapid curing characteristics.
Nanotechnology Integration: The incorporation of nanomaterials such as carbon nanotubes and nanoparticles into UV-CIPP resins to enhance strength, toughness, and durability.
Bio-Based Resins: Development of environmentally friendly resins derived from renewable resources, reducing the carbon footprint of UV-CIPP systems.
Self-Healing Materials: Research into self-healing resin systems that can automatically repair minor damage, extending the service life of the liner.
Smart Materials: Development of materials that can provide information about the condition of the liner through embedded sensors or by changing properties in response to environmental conditions.
8.2 Technological Innovations in Curing Systems
The UV curing technology used in UV-CIPP applications is rapidly evolving, with several key innovations:
High-Power LED Systems: Increasing UV LED power up to 2,4 kW ensures curing speeds 2.5 times faster than traditional UV lamp chains, while using one-third of the electrical power (28). This lower consumption allows for systems with up to 1,000 meters of umbilical cable.
Hybrid Curing Systems: Combination of UV curing with other curing methods to achieve faster curing times or improved material properties.
Intelligent Curing Control: Development of systems that can automatically adjust curing parameters based on real-time monitoring of the curing process, ensuring optimal results in varying conditions.
Energy-Efficient Systems: Continued improvements in the energy efficiency of UV curing systems, reducing operating costs and environmental impact.
Portable Curing Units: Development of more compact and portable UV curing units that can be easily transported and operated in confined spaces.
8.3 Automation and Digitalization in UV-CIPP
The integration of automation and digital technologies is transforming the UV-CIPP industry:
Automated Liner Insertion: Development of robotic systems for more precise and efficient liner insertion, reducing labor requirements and improving installation quality.
Real-Time Monitoring: Use of sensors and monitoring systems to track the installation process in real-time, providing immediate feedback and allowing for adjustments as needed.
Digital Twins: Creation of digital models that simulate the installation process and predict the performance of the cured liner, allowing for optimized design and troubleshooting before installation.
Augmented Reality (AR): Application of AR technology to assist with the planning, installation, and inspection of UV-CIPP systems.
Data Analytics: Use of advanced analytics to evaluate installation data and identify patterns and trends that can inform process improvements and quality control.
8.4 Market Trends and Industry Developments
The UV-CIPP market is experiencing significant growth and transformation, driven by technological advancements and changing industry needs:
Market Expansion: The global CIPP market is expected to grow significantly in the coming years, with UV-CIPP capturing an increasing share due to its advantages over traditional methods.
Standardization: Development of more comprehensive standards and guidelines for UV-CIPP applications, improving quality control and ensuring consistent performance.
Training and Certification: Growth in training programs and certification systems for UV-CIPP installers, ensuring a skilled workforce capable of delivering high-quality installations.
Cross-Industry Adoption: Expansion of UV-CIPP applications beyond traditional wastewater and stormwater systems to other sectors such as potable water, industrial pipelines, and gas distribution.
Sustainability Focus: Growing emphasis on sustainability in the trenchless industry, driving the development of more environmentally friendly materials and processes.
8.5 Future Outlook for UV-CIPP Technology
The future of UV-CIPP technology looks promising, with several key trends expected to shape its development:
Increased Adoption: UV-CIPP is expected to become the preferred rehabilitation method for many applications due to its combination of high performance, efficiency, and minimal disruption.
Expanded Application Range: Continued expansion of UV-CIPP applications to new markets and challenging environments, including high-temperature applications, deep buried pipes, and pipelines in seismic zones.
Enhanced Performance: Further improvements in material performance, installation techniques, and curing methods will expand the capabilities of UV-CIPP systems.
Improved Sustainability: Development of more sustainable materials and processes will enhance the environmental credentials of UV-CIPP technology.
Integration with Smart City Infrastructure: UV-CIPP systems will increasingly incorporate smart features that enable integration with broader smart city infrastructure, providing real-time data on pipeline condition and performance.
IX. Implementation Considerations and Best Practices
9.1 Project Planning and Preparation
Successful implementation of UV-CIPP projects requires careful planning and preparation:
Comprehensive Assessment: Conduct a thorough assessment of the host pipeline condition using techniques such as CCTV inspection, structural analysis, and hydraulic modeling. This assessment forms the basis for the design and selection of the appropriate rehabilitation method.
Stakeholder Engagement: Engage with all relevant stakeholders, including property owners, regulatory agencies, and utility companies, to ensure alignment on project goals and requirements.
Detailed Design: Develop a detailed design based on the assessment findings, including specifications for materials, installation methods, and performance criteria.
Contingency Planning: Develop contingency plans for potential challenges such as unexpected pipe conditions, adverse weather, or equipment failures.
Permitting and Compliance: Ensure all necessary permits and approvals are obtained, and that the project complies with all relevant regulations and standards.
9.2 Material Selection Best Practices
Selecting the right materials is critical to the success of a UV-CIPP project:
Application-Specific Selection: Choose materials based on the specific requirements of the application, including pipe diameter, expected loads, chemical exposure, and environmental conditions.
Manufacturer Qualification: Select materials from reputable manufacturers with proven track records in UV-CIPP applications.
Material Testing: Conduct thorough testing of materials to verify compliance with specifications and ensure they meet performance requirements.
Compatibility Assessment: Ensure all materials used in the system are compatible with each other and with the host pipe and its contents.
Storage and Handling: Establish proper procedures for the storage and handling of materials to maintain their quality and performance characteristics.
9.3 Installation Process Optimization
To achieve optimal results with UV-CIPP installations:
Equipment Selection: Select appropriate equipment based on the project requirements, including liner size, pipe conditions, and site constraints.
Installation Team Training: Ensure installation teams are properly trained and certified in UV-CIPP techniques.
Process Monitoring: Implement comprehensive monitoring of the installation process to ensure adherence to specifications and identify potential issues early.
Quality Control: Establish rigorous quality control procedures for all aspects of the installation, from material preparation to final inspection.
Documentation: Maintain detailed documentation of the installation process, including parameters, observations, and test results.
9.4 Maintenance and Long-Term Performance
Proper maintenance is essential to ensure the long-term performance of UV-CIPP liners:
Regular Inspection: Implement a regular inspection schedule to monitor the condition of the rehabilitated pipeline.
Preventive Maintenance: Develop and implement preventive maintenance programs to address minor issues before they become major problems.
Performance Monitoring: Monitor the hydraulic and structural performance of the rehabilitated pipeline to ensure it continues to meet design requirements.
Record Keeping: Maintain comprehensive records of inspections, maintenance activities, and performance data to inform future maintenance decisions.
Lifespan Extension Strategies: Develop strategies for extending the service life of UV-CIPP liners, such as periodic cleaning, protective coatings, or additional structural reinforcements as needed.
9.5 Safety Considerations
Safety should be a top priority in all aspects of UV-CIPP projects:
Personal Protective Equipment (PPE): Ensure all personnel involved in the project wear appropriate PPE, including eye protection, gloves, and respiratory protection as needed.
Ventilation: Provide adequate ventilation in confined spaces to prevent the accumulation of hazardous gases.
Electrical Safety: Implement proper safety measures for all electrical equipment used in the installation process.
UV Exposure: Protect personnel from direct exposure to UV light sources, which can cause eye damage and skin burns.
Emergency Preparedness: Develop and practice emergency response plans for potential incidents such as equipment failures, material spills, or personnel injuries.
X. Conclusion
10.1 Summary of Key Findings
UV-CIPP technology has emerged as a leading trenchless rehabilitation method for underground drainage pipes, offering numerous advantages over traditional methods. Key findings from this technical guide include:
Material Advancements: Modern UV-CIPP systems utilize advanced resin formulations and glass fiber reinforcement materials to achieve superior mechanical properties, chemical resistance, and durability.
Installation Efficiency: UV-CIPP cures much faster than traditional CIPP methods, reducing installation time from hours to minutes and significantly improving project efficiency.
Performance Advantages: UV-CIPP liners offer excellent structural performance, hydraulic characteristics, and chemical resistance, making them suitable for a wide range of applications.
Cost-Effectiveness: Despite higher initial costs, the long-term performance and reduced life-cycle costs of UV-CIPP systems make them a cost-effective choice for many applications.
Environmental Benefits: UV-CIPP systems produce fewer emissions, consume less energy, and generate less waste than many traditional rehabilitation methods.
10.2 Industry Impact and Value Proposition
UV-CIPP technology has had a transformative impact on the trenchless rehabilitation industry, providing significant value to stakeholders:
For Municipalities: UV-CIPP offers a cost-effective solution for rehabilitating aging infrastructure with minimal disruption to communities and traffic.
For Contractors: The efficiency and productivity advantages of UV-CIPP allow contractors to complete more projects in less time, improving profitability.
For Engineers: UV-CIPP provides engineers with a reliable and versatile tool for addressing a wide range of pipeline rehabilitation challenges.
For End Users: The improved performance and extended service life of UV-CIPP systems provide long-term value and reduce the frequency of future maintenance needs.
10.3 Recommendations for Implementation
Based on the insights provided in this technical guide, the following recommendations are offered for successful implementation of UV-CIPP projects:
Comprehensive Assessment: Conduct thorough assessments of pipeline conditions before selecting a rehabilitation method.
Material Selection: Choose materials based on application-specific requirements, including chemical resistance, structural needs, and environmental conditions.
Installation Team Training: Ensure installation teams are properly trained and certified in UV-CIPP techniques.
Quality Control: Implement rigorous quality control measures throughout the project, from material selection to final inspection.
Maintenance Planning: Develop comprehensive maintenance plans to ensure the long-term performance of rehabilitated pipelines.
10.4 Future Outlook
The future of UV-CIPP technology is promising, with several key trends expected to shape its development:
Technology Integration: Continued integration of advanced technologies such as automation, digitalization, and smart materials into UV-CIPP systems.
Sustainability Focus: Development of more environmentally friendly materials and processes to reduce the carbon footprint of UV-CIPP systems.
Application Expansion: Continued expansion of UV-CIPP applications to new markets and challenging environments.
Performance Enhancement: Further improvements in material performance, installation techniques, and curing methods will expand the capabilities of UV-CIPP systems.
In conclusion, UV-CIPP technology represents a significant advancement in trenchless pipeline rehabilitation, offering superior performance, efficiency, and sustainability compared to traditional methods. As materials and technologies continue to evolve, UV-CIPP is poised to become the preferred choice for an increasing range of pipeline rehabilitation applications.
参考资料
[1] 浅析紫外光固化修复技术国内外标准 http://m.qikan.cqvip.com/Article/ArticleDetail?id=7104970292
[2] 玻纤结构对紫外光固化修复复合材料力学性能提升机制研究 http://d.wanfangdata.com.cn/thesis/Y4347966
[3] 紫外光固化快速修复复合绝缘材料的研究 http://d.wanfangdata.com.cn/thesis/D03390984
[4] 紫外光原位固化修复材料及设备研究应用 http://epub.cqvip.com/articledetail.aspx?id=1000004052786
[5] Application of UV CIPP in the Sewer Renewal of Baozhou Road in Quanzhou City, China https://www.semanticscholar.org/paper/Application-of-UV-CIPP-in-the-Sewer-Renewal-of-Road-Liao-Ti/59c1d768cd743c7ddddd171fa4ef718afcaf2102
[6] 排水管道紫外光固化(CIPP)修复施工技术 http://d.wanfangdata.com.cn/periodical/shicai202407022
[7] 提供紫外线固化健康和安全指南 https://m.zhangqiaokeyan.com/journal-foreign-detail/070409503080.html
[8] Impact of Stormwater Pipe Lining Materials on Water Quality: https://journals.sagepub.com/doi/abs/10.3141/2362-07?journalCode=trra
[9] 紫外光固化修复技术的质量控制 http://m.qikan.cqvip.com/Article/ArticleDetail?id=7111866716
[10] 紫外光固化技术在市政管道非开挖修复中的应用 http://epub.cqvip.com/articledetail.aspx?id=1000004333323
[11] Parameter Analysis of Wall Thickness of Cured-in-Place Pipe Linings for Semistructured Rehabilitation of Concrete Drainage Pipe https://www.hindawi.com/journals/mpe/2020/5271027/
[12] 紫外光固化法修复技术质量控制问题与讨论 http://m.qikan.cqvip.com/Article/ArticleDetail?id=7112696906
[13] 雨污水管道紫外光原位固化修复施工技术研究 http://m.qikan.cqvip.com/Article/ArticleDetail?id=1000004190314
[14] Construction Cost Comparison between Trenchless Cured-in-Place Pipe (CIPP) Renewal and Open-Cut Replacement for Sanitary Sewer Applications https://www.semanticscholar.org/paper/Construction-Cost-Comparison-between-Trenchless-and-Kaushal-Najafi/d4078ae873d55932f75f65f616e91a65f2ea36a6
[15] 城镇排水管道CIPP紫外光固化修复技术工程应用 https://m.zhangqiaokeyan.com/academic-journal-cn_water-wastewater-engineering_thesis/02012154354132.html
[16] 紫外光固化技术在非开挖排水管道修复中的应用 http://d.wanfangdata.com.cn/periodical/ynslfd202407027
[17] Intelligent Diagnosis of Urban Underground Drainage Network: From Detection to Evaluation https://www.semanticscholar.org/paper/Intelligent-Diagnosis-of-Urban-Underground-Drainage-Luo-Du/bb6d7fd5a9b3d3aa4f57942c9f750a7c90840c75
[18] How is CIPP likely to be used in the future? https://trenchlesspedia.com/whats-the-future-of-uv-cured-in-place-pipe-rehabilitation/7/4635
[19] UV CIPP Archives | Trenchless Technology https://trenchlesstechnology.com/tag/uv-cipp/
[20] Europe Ultraviolet (UV) Curing System Market Report – Industry Trends and Forecast to 2030 | Data Bridge Market Research https://www.databridgemarketresearch.com/reports/europe-uv-curing-system-market/amp
[21] Why UV Cast-In-Place Technology is Superior to Traditional Steam Cure CIPP Methods | Waterline Renewal Technologies https://waterlinerenewal.com/blog/why-uv-cast-in-place-technology-is-superior-to-traditional-steam-cure-cipp-methods/
[22] Which CIPP Method is Right for Your Project? | Cleaner https://www.cleaner.com/online_exclusives/2023/02/which-cipp-method-is-right-for-your-project_sc_00mxp
[23] What is UV CIPP? - Advanced Pipe Repair https://www.advancedpiperepair.com/what-is-uv-cipp/
[24] Light Bright: Ultraviolet Curing Continues to Make Inroads in the CIPP Market | Trenchless Technology https://trenchlesstechnology.com/light-bright-ultraviolet-curing-continues-to-make-inroads-in-the-cipp-market/
[25] UV Becomes Complimentary Process To Conventional CIPP | Underground Construction https://undergroundinfrastructure.com/magazine/2015/july-2015-vol-70-no-7/features/uv-becomes-complimentary-process-to-conventional-cipp
[26] Electron Beam and Ultra Violet project already reducing GHG emissions in Europe https://cinea.ec.europa.eu/featured-projects/electron-beam-and-ultra-violet-project-already-reducing-ghg-emissions-europe_en
[27] How Ultraviolet-C lighting can support Europe’s recovery https://www.theparliamentmagazine.eu/news/article/how-ultraviolet-lighting-can-support-europes-recovery
[28] WHY UV LED CURING IS THE PRESENT & FUTURE OF CIPP RENOVATION https://www.linkedin.com/pulse/why-uv-led-curing-present-future-cipp-renovation-c%C3%A9sar-g%C3%B3mez
[29] UV Technology and One Water Research Around the Globe - UV Solutions https://uvsolutionsmag.com/articles/2024/uv-technology-and-one-water-research-around-the-globe-2/
[30] CIPP With UV Curing The Best Choice In Sewer Rehabilitation http://www.linkedin.com/pulse/cipp-uv-curing-best-choice-sewer-rehabilitation-ratish-choudhary
[31] Frontiers | A review of spiral wound membrane modules and processes for groundwater treatment https://www.frontiersin.org/journals/membrane-science-and-technology/articles/10.3389/frmst.2024.1343651/full
[32] U.S. Patent Application for Membrane separating method and membrane module for processing liquids Patent Application (Application #20230191334 issued June 22, 2023) - Justia Patents Search https://patents.justia.com/patent/20230191334
[33] UV Tapes Market Size & Outlook, 2025 to 2035 https://www.futuremarketinsights.com/reports/uv-tapes-market
[34] highly reflective material is ideal for UV and lighting systems https://www.porex.com/markets/reflective-media/
[35] UV LEDs Manufacturing Plant Report 2025: Setup Cost https://www.imarcgroup.com/uv-leds-manufacturing-plant-project-report
[36] Uv Light Projects Information from Worldwide 2025 - Bid Detail https://www.biddetail.com/projects-information/uv-light
[37] Europe UV Filter Market Report Size, Share, and Trends Analysis Report – Industry Overview and Forecast to 2031 | Data Bridge Market Research https://www.databridgemarketresearch.com/reports/europe-uv-filter-market/amp
[38] UV Curable Coatings Market Size, Industry Share Forecast Trends Report, [Latest] https://www.marketsandmarkets.com/Market-Reports/uv-coatings-market-92686798.html
[39] Europe UV Coatings Market: Growth Potential and Industry Analysis (2024-2030) https://www.stellarmr.com/report/Europe-UV-Coatings-Market/279
[40] ASTM-D6908 | Standard Practice for Integrity Testing of Water Filtration Membrane Systems | Document Center, Inc. https://www.document-center.com/standards/show/ASTM-D6908
[41] Paper Standards and Packaging Standards - Standards Products - Standards & Publications - Products & Services https://www.astm.org/products-services/standards-and-publications/standards/paper-standards-and-packaging-standards.html
[42] Powder Characterization according to ASTM Standards https://www.microtrac.com/applications/metal-powders-astm-standards/
[43] UV-CIPP an Ideal Solution to Rehab Interceptor Under Maine Turnpike https://trenchlesstechnology.com/uv-cipp-used-under-maine-turnpike/
[44] Interflow’s spiral wound lining for sustainable pipe maintenance - Trenchless Australasia https://www.trenchless-australasia.com/2023/08/02/interflows-spiral-wound-lining-for-sustainable-pipe-maintenance-2/
[45] Web-Based Database on Renewal Technologies https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100PHAK.txt
[46] Open cut trench method vs. UV-CIPP | SAERTEX multiCom https://www.saertex-multicom.de/en/blog/open-cut-trench-method-vs-uv-cipp
[47] Technical Specifications (TS) https://boss.cen.eu/developingdeliverables/ts/pages
[48] Standards search https://genorma.com/en/project/list/4?status%5B0%5D=IN_DEVELOPMENT&status%5B1%5D=PUBLISHED&operatorCommittee=1&ics=91.120.10&operatorStdType=3&listMode=DEFAULT
[49] Green lights for composites growth in construction - JEC https://www.jeccomposites.com/news/green-lights-for-composites-growth-in-construction/
[50] UV CIPP expands the toolbox for addressing environmentally complex sewer rehabilitation | Stormwater Solutions https://www.stormwater.com/stormwater-management/sewers-drainage-systems/article/53042939/uv-cipp-expands-the-toolbox-for-addressing-environmentally-complex-sewer-rehabilitation
[51] Product Spotlight: CIPP ‘Cold Cure’ UV System Touted for | Cleaner https://www.cleaner.com/editorial/2023/02/product-spotlight-cipp-cold-cure-uv-system-touted-for-fast-high-density-lining
[52] UV Curing System Market Size, Share, Trends Analysis 2031 https://www.precisionbusinessinsights.com/market-reports/uv-curing-system-market/
[53] UV Light Disinfection Market Strategies: Trends and Outlook 2025-2033 https://www.datainsightsmarket.com/reports/uv-light-disinfection-902907
[54] Frontiers | Disinfection of indoor air for the inactivation of SARS-CoV-2: a review of the effectiveness of UV-C technology and gaps in research https://www.frontiersin.org/journals/built-environment/articles/10.3389/fbuil.2024.1523055/full
[55] CEN in Figures - CEN-CENELEC https://www.cencenelec.eu/about-cen/cen-in-figures/
[56] Standards support a secure Europe: CEN and CENELEC welcome the Polish presidency of the EU - CEN-CENELEC https://www.cencenelec.eu/news-and-events/news/2025/press-releases/2025-01-09-polish-presidency/
[57] Transforming European Standards with the SMART Project - CEN-CENELEC https://www.cencenelec.eu/news-and-events/news/2025/brief-news/2025-01-16-smart-phase-1-launch/
[58] Case Study: WEDECO UV Disinfection Systems at German River Dam | Xylem US https://www.xylem.com/en-us/support/case-studies-white-papers/wedeco-uv-disinfection-systems-at-german-river-dam/
[59] Case Study: Xylem provides sustainable, compact UV disinfection solution to German water treatment plant | Xylem US https://www.xylem.com/en-us/support/case-studies-white-papers/xylem-provides-sustainable-compact-uv-disinfection-german/
[60] German suncream test finds 7 brands offer insufficient UV protection https://www.iamexpat.de/lifestyle/lifestyle-news/german-suncream-test-finds-7-brands-offer-insufficient-uv-protection
[61] Munich schools wheel out 7500 mobile UV-C units to combat coronavirus | LEDs Magazine https://www.ledsmagazine.com/lighting-health-wellbeing/article/14232692/munich-schools-wheel-out-7500-mobile-uvc-units-to-combat-coronavirus
[62] Additional Investigations of UV-C Irradiation Schemes for Viral Decontamination of FFP2 Masks | Disaster Medicine and Public Health Preparedness | Cambridge Core https://www.cambridge.org/core/journals/disaster-medicine-and-public-health-preparedness/article/additional-investigations-of-uvc-irradiation-schemes-for-viral-decontamination-of-ffp2-masks/6812B71666482B7B003E81278F5596D0
[63] Trenchless Pipe Repair Market Size & Share 2025-2030 https://www.360iresearch.com/library/intelligence/trenchless-pipe-repair
[64] Trunk Sewer Rehab Using Spiral Wound Liner https://trenchlesstechnology.com/spirally-wound-solution-for-a-deteriorated-trunk-sewer/
[65] A Prime Resource for CIPP Education | Cleaner https://www.cleaner.com/online_exclusives/2023/09/a-prime-resource-for-cipp-education
[66] Towards a More Inclusive Standardization System: SSG’s New Three-Year Mandate Begins - CEN-CENELEC https://www.cencenelec.eu/news-and-events/news/2025/newsletter/ots-62-ssg/
[67] EuCIA publishes update on future Eurocode for composites - JEC https://www.jeccomposites.com/news/spotted-by-jec/eucia-publishes-update-on-future-eurocode-for-composites/
[68] Treating Micropollutants With UV In Drinking Water - PWN, Netherlands (Case Study) - TrojanUV https://www.wateronline.com/doc/treating-micropollutants-and-disinfecting-wit-0002?sectionCode=TOC&user=20
[69] UV radiation in the Netherlands: Assessing long‐term variability and trends in relation to ozone and clouds - den Outer - 2005 - Journal of Geophysical Research: Atmospheres - Wiley Online Library https://agupubs.onlinelibrary.wiley.com/doi/full/10.1029/2004JD004824
[70] Optimizing Uvc-Disinfection Using Leds as an Energy Efficient Pre-Treatment for Biofouling Control in Spiral Wound Membrane Systems by Philipp Sperle, Mohammad Khan, Bertram Skibinski, Christian Wurzbacher, Jörg E. Drewes :: SSRN https://papers.ssrn.com/sol3/papers.cfm?abstract_id=4326456
[71] Spiral Wound vs blow molding | Trouble Free Pool https://www.troublefreepool.com/threads/spiral-wound-vs-blow-molding.283619/
[72] Spiral path UV sterilizers vs. direct ones | The Planted Tank Forum https://www.plantedtank.net/threads/spiral-path-uv-sterilizers-vs-direct-ones.1309963/
[73] Spiral Tubing | Shrink and Non-Shrink | Electrolock https://www.electrolock.com/solutions/spiral-wound-tubing/
[74] 2025 The Complete Guide To UV curing ink in use in the problem - Longchang Chemical https://longchangchemical.com/the-complete-guide-to-uv-curing-ink-in-use-in-the-problem/
[75] Global Market Access Regulatory News Update | UL Solutions https://www.ul.com/resources/global-market-access-regulatory-news-update
[76] Consumer Products | Regulatory News | December 2022 https://www.eurofins.com/consumer-product-testing/media-centre/news/regulatory-updates-12-2022/
[77] L_202401084EN.000101.fmx.xml https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=OJ:L_202401084
[78] Open channel UV-system helps French wastewater treatment plant comply with strict guidelines | WaterWorld https://www.waterworld.com/wastewater-treatment/article/16218229/open-channel-uv-system-helps-french-wastewater-treatment-plant-comply-with-strict-guidelines
[79] UV Medico | Far-UVC and UV222 | Disinfecting and Decontaminate https://uvmedico.com/
[80] UV Disinfection Equipment Market Size, Share, Trends and Industry Growth 2032 https://www.marketsandmarkets.com/Market-Reports/uv-disinfection-market-217291665.html
[81] Achieving accelerated elimination of hepatitis C virus infection by 2025: a case study in France https://www.natap.org/2019/EASL/EASL_23.htm
[82] Cured-in-Place-Pipe (CIPP) Rehabilitation Emissions Study | The Water Research Foundation https://www.waterrf.org/research/projects/cured-place-pipe-cipp-rehabilitation-emissions-study
[83] Are you getting the most out of your spiral wound membranes? | Ecolab https://www.ecolab.com/articles/2020/10/are-you-getting-the-most-out-of-your-spiral-wound-membranes
[84] Technical guide to variations of close-fit liners for mainline pipe | Underground Construction https://undergroundinfrastructure.com/magazine/2023/april-2023-vol-78-no-4/rehab-technology/technical-guide-to-variations-of-close-fit-liners-for-mainline-pipe
[85] Digital Society - CEN-CENELEC https://www.cencenelec.eu/areas-of-work/cen-sectors/digital-society-cen/
[86] New Standards Will Require Certification for RNs https://bcen.org/new-camts-standards-will-require-transport-specific-certification-for-rns/
[87] Solar Photovoltaic and Thermal Energy - CEN-CENELEC https://www.cencenelec.eu/areas-of-work/cenelec-sectors/energy-and-utilities-cenelec/solar-photovoltaic-and-thermal-energy
[88] STAY PROTECTED, STAY CONNECTED: O2 Unveils Skin-like UV-Sensitive ‘Skincase’ to Promote Sun Safety While Roaming - Virgin Media O2 https://news.virginmediao2.co.uk/stay-protected-stay-connected/
[89] Self‐reported Side‐effects of Ultraviolet‐C Disinfection Devices - Adams - Photochemistry and Photobiology - Wiley Online Library https://onlinelibrary.wiley.com/doi/10.1111/php.13766
[90] UV curing - Page 1 | PCI Magazine https://www.pcimag.com/keywords/3912-uv-curing
[91] Smart Cities Changing CIPP Acceptance and Pipe Condition Standards http://www.linkedin.com/pulse/smart-cities-changing-cipp-acceptance-pipe-condition-standards-chuck
[92] Open Access Policy - Journals - Standards & Publications - Products & Services https://www.astm.org/products-services/standards-and-publications/journals/open-access.html
[93] GLOBAL AUTOMOTIVE REGULATIONS UPDATES IN APRIL 2024 https://www.atic-ts.com/global-automotive-regulations-updates-in-april-2024/
[94] 0568 Welding of plastics https://www.en-standard.eu/csn-standards/05-welding-soldering-cutting-of-metals-and-plastics/0568-welding-of-plastics/
[95] CEN/TS 16800:2020 https://www.normadoc.com/french/cen-ts-16800-2020-3119690.html
[96] Cured in Place Pipe (CIPP) Market Size ($14.8 Billion) 2030 https://www.strategicmarketresearch.com/market-report/cured-in-place-pipe-market
[97] The 2025 IUVA World Congress Draft Program is Now Available - UV Solutions https://uvsolutionsmag.com/press-release/2025/the-2025-iuva-world-congress-draft-program-is-now-available/
[98] Cured-in-Place Pipe Market Trends, Growth, Forecast, 2030 https://www.stratviewresearch.com/287/Cured-in-Place-Pipe-CIPP-Market.html
[99] Sterilizing UV-LED Market’s Strategic Roadmap: Insights for 2025-2033 https://www.datainsightsmarket.com/reports/sterilizing-uv-led-951074
[100] When Prescribing a Cure, First Do No Harm - UV+EB Technology https://uvebtech.com/articles/2022/when-prescribing-a-cure-first-do-no-harm/
[101] UV CIPP in Eastern Canada Poised for Growth | Trenchless Technology https://trenchlesstechnology.com/uv-cipp-in-eastern-canada-poised-for-growth/
[102] What are the Benefits of UV Pipe Lining? - Trenchless Pipe Lining & Pipe Relining https://nuflow.com/blog/what-are-the-benefits-of-uv-pipe-lining/
[103] Global E-invoicing Updates Q2 2024 | Unifiedpost Group https://www.unifiedpostgroup.com/news/the-latest-tax-compliance-updates-q2-2024
[104] Coupe-ongle de Trois-Sept TS-16100 - Now In Seoul % https://nowinseoul.com/product/coupe-ongle-du-trois-sept-ts-16100/
[105] CE | STAMFORD | AvK https://www.stamford-avk.com/product-compliance/CE
[106] UNE-CEN/TS 16629:2024 | Normas AENOR https://en.tienda.aenor.com/norma-une-cen-ts-16629-2024-n0073888
[107] An Overview of UV Curing for Pipeline Repair | Austeck https://www.austeck.com/an-overview-of-uv-curing-for-pipeline-repair/
[108] A Tool for Any Task: Spiral Wound Tubing Materials - Electrolock Incorporated https://www.electrolock.com/thought-leadership/a-tool-for-any-task-spiral-wound-tubing-materials/
[109] News 11/2023 https://www.en-standard.eu/news-11-2023/
[110] CEN/TS 16976 and 17434 | TSI https://tsi.com/focus/validate-or-calibrate/cen-ts-16976/
[111] CEN/TS 16628:2024 https://genorma.com/en/standards/fprcen-ts-16628
[112] UV Curing System Market Size, Share & Industry Trends Report 2032 https://www.marketsandmarkets.com/Market-Reports/uv-curing-system-market-201220731.html
[113] United Kingdom (UK) UV Curing System Market (2025-2031) | Trends, Outlook & Forecast https://www.6wresearch.com/industry-report/united-kingdom-uk-uv-curing-system-market
[114] Geotechnical Engineering Standards - Standards Products - Standards & Publications - Products & Services https://www.astm.org/products-services/standards-and-publications/standards/geotechnical-engineering-standards.html
[115] How Light Cure CIPP Helps This Family Business Expand https://www.ecmconnection.com/doc/how-light-cure-cipp-helps-this-family-business-expand-0001
[116] Waste Management Standards - Standards Products - Standards & Publications - Products & Services https://www.astm.org/products-services/standards-and-publications/standards/waste-management-standards.html
[117] Water Testing Standards - Standards Products - Standards & Publications - Products & Services https://www.astm.org/products-services/standards-and-publications/standards/water-testing-standards.html